Quick Contact
Yancey Engineered Solutions
96 Ethridge Mill Park
Griffin, GA 30224
Phone: 770-233-4397
Toll Free: 877-736-7937
Fax: 770-233-4940
Mine Motivation


This containerized 53 foot, 50 Ton, CAT 3516, 1.8 mWe dual medium voltage (7.2 and 4.16KV) “Motivator” complete with C02 fire suppression and switchgear, MV transformer/NGR and engine room compartments and 12 hours of fuel capacity was designed and built by YES.
We are very proud of our customer relations none more so than the comments of our customers.
“This project was FABCO’s first experience with Yancey Engineered Solutions, but not likely the last. The YES staff was a great asset throughout the entire project timeline from acquiring the order to delivery. As a team, we overcame many obstacles both technical and production related. Their team exhibited great dedication, enthusiasm, craftsmanship, attention to detail, and most importantly great integrity. Their ability to deliver on-time despite numerous challenges is a testament to their abilities in addition to the spectacular finished product that speaks for itself.”
Jon Rodriguez, PE – Sr. Project Manager FABCO Power Systems
© 2012 Yancey Engineered Solutions. All Rights Reserved. | Site Credits